Arshad, M F, Thaheem, M J, Nasir, A R and Malik, M S A (2019) Contractual Risks of Building Information Modeling: Toward a Standardized Legal Framework for Design-Bid-Build Projects. Journal of Construction Engineering and Management, 145(04).

Baek, M and Ashuri, B (2019) Analysis of the Variability of Submitted Unit Price Bids for Asphalt Line Items in Highway Projects. Journal of Construction Engineering and Management, 145(04).

Chao, L and Liaw, S (2019) Fuzzy Logic Model for Determining Minimum Overheads-Cum-Markup Rate. Journal of Construction Engineering and Management, 145(04).

Deng, Y, Gan, V J L, Das, M, Cheng, J C P and Anumba, C (2019) Integrating 4D BIM and GIS for Construction Supply Chain Management. Journal of Construction Engineering and Management, 145(04).

Hacker, M E, Kaminsky, J and Faust, K M (2019) Legitimizing Involvement in Emergency Accommodations: Water and Wastewater Utility Perspectives. Journal of Construction Engineering and Management, 145(04).

Jin, R and Chen, Q (2019) Overview of Concrete Recycling Legislation and Practice in the United States. Journal of Construction Engineering and Management, 145(04).

Kereri, J O and Harper, C M (2019) Social Networks and Construction Teams: Literature Review. Journal of Construction Engineering and Management, 145(04).

Kim, J, Ham, Y, Chung, Y and Chi, S (2019) Systematic Camera Placement Framework for Operation-Level Visual Monitoring on Construction Jobsites. Journal of Construction Engineering and Management, 145(04).

  • Type: Journal Article
  • Keywords: Visual monitoring; Operation-level; Construction jobsite; Camera placement; Optimization; Multiobjective; Art gallery problem; Genetic algorithm; Hybrid simulation-optimization;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001636
  • Abstract:
    This paper proposes a camera placement framework that incorporates characteristics of complex construction jobsites. The proposed framework consists of three main processes: (1) identification of visual monitoring determinants, influencing factors, and camera placement conditions; (2) problem definition and mathematical modeling; and (3) hybrid simulation-optimization of camera placement on construction jobsites. To evaluate the performance of the proposed framework, a case study for an actual construction jobsite was performed. The results of the case study show the potential of the proposed framework to find the optimal number, types, locations, and orientations of cameras for jobsite visual monitoring. This research makes three main contributions: (1) identification of critical elements to be considered when installing fixed cameras on complex construction jobsites; (2) development of a systematic framework for camera placement on jobsites; and (3) visualization and quantification of multiple camera network designs and their performance (i.e., total costs and visible coverages) before installing cameras at actual jobsites.

Li, H, Wang, M and Dong, X (2019) Resource Leveling in Projects with Stochastic Minimum Time Lags. Journal of Construction Engineering and Management, 145(04).

Li, Y, Li, G, Wang, T, Zhu, Y and Li, X (2019) Semicustomized Design Framework of Container Accommodation for Migrant Construction Workers. Journal of Construction Engineering and Management, 145(04).

Mitikie, B B and Lee, T S (2019) Experimental Investigation of Enzyme Stabilization and Its Effect on Clay Brick. Journal of Construction Engineering and Management, 145(04).

Nasirian, A, Arashpour, M, Abbasi, B and Akbarnezhad, A (2019) Optimal Work Assignment to Multiskilled Resources in Prefabricated Construction. Journal of Construction Engineering and Management, 145(04).

Noorizadeh, A, Peltokorpi, A and Avkiran, N K (2019) Supplier Performance Evaluation in Construction Projects: Challenges and Possible Solutions. Journal of Construction Engineering and Management, 145(04).

O’Connor, J T and Mock, B D (2019) Construction, Commissioning, and Startup Execution: Problematic Activities on Capital Projects. Journal of Construction Engineering and Management, 145(04).

Oswald, D, Wade, F, Sherratt, F and Smith, S D (2019) Communicating Health and Safety on a Multinational Construction Project: Challenges and Strategies. Journal of Construction Engineering and Management, 145(04).

Son, J, Khwaja, N and Milligan, D S (2019) Planning-Phase Estimation of Construction Time for a Large Portfolio of Highway Projects. Journal of Construction Engineering and Management, 145(04).

Wu, L, Jia, G and Mackhaphonh, N (2019) Case Study on Improving the Effectiveness of Public Participation in Public Infrastructure Megaprojects. Journal of Construction Engineering and Management, 145(04).

Xiong, B, Skitmore, M, Xia, P, Ballesteros-Pérez, P, Ye, K and Zhang, X (2019) Impact of Corporate Credit Scoring on Construction Contractors in China. Journal of Construction Engineering and Management, 145(04).